Hydroponic Grow Facility in Elstree

Brief

This customer contacted us when they needed new flooring for the packing area in their warehouse.

Process

The client emailed us sizes of the room along with photos of the space. Having liaised with the client to understand their needs, we sent them some samples.

The client reviewed samples that we provided and chose a colour from the Altro Walkway range. The client expressed that they would get their own builders to ply the floor ready for our arrival. We provided them with a spec sheet, which included using SP101 or FG1 plywood and nail requirements. They asked us to proceed with the job which included:

  • Subfloor preparation to feather plywood joins
  • Fitting of Altro Walkway safety flooring including upstands
  • Welding to joins and upstands
  • Black capping and coving
  • Installation of door bars

Result

The finished flooring gives the space a clean and hygienic solution, allowing easy maintenance to keep it looking good.